Since 2012

CC Stroymost-1 carries out expert examination of the design and estimate documentation relating to Project “Reconstruction and Development of the Small Ring of the Moscow Railway. Organization of Passenger Traffic”, has developed the estimate documentation for “Construction of Bridge Crossing Across the Lena River near Yakutsk, the Republic of Sakha (Yakutia)” as part of justification of investments. CC Stroymost-1 per-forms a package of works relating to expert examination of the design and estimate documentation and development of individual indices of reestimation of the cost of works for the airdrome reconstruction projects: “Reconstruction of the Severomorsk Aerodrome located at: Severomorsk, the Murmansk Region (1st and 2nd launch com-plexes)”, “Reconstruction of the Privolzhsky Aerodrome in the Astrakhan Region (1st launch complex, 1 stage)”, “Reconstruction of the Korenovsk Aerodrome in Korenovsk, the Krasnodar Region (1st launch complex, 1 stage), project code 10054”.

Construction Company Stroymost-1 has developed individual indices of reestimation of the cost of works related to “Construction the Seaport Facilities near the Village of Sabetta in the Yamal Peninsu-la, including the Construction of a Navigation Access Channel in the Gulf of Ob (basic facilities of the seaport)”.

CC Stroymost-1 develops the estimate documentation relating to Project “Reconstruction of the Bal-timor Aerodrome, Voronezh (project code 28/162), 1 launch complex, 1 stage (pro-ject code 28/162-1.1)”.

2008-2012 Construction Company Stroymost-1 participates in the development of the design and estimate documentation for the construction and reconstruction of a great number of large sophisticated facilities on railways and automobile roads, such as the bridge crossing to Russky Island across the Eastern Bosphorus Strait, in Vladivostok, 46 bridges per facility “Combined (au-tomobile and rail) road from Adler to the mountain climate resort “Alpika-Service” (design and survey works, construction), of railway bridges across the rivers of Zeya, Buzan, Kama, Ob, Don, Oka, Sheksna, Tura, Tysia, Syzranka, automobile bridges across the rivers of Staraya and Novaya Pregolya in Kaliningrad.
1999-2007 LLC CC Stroymost-1 participates in the reconstruction of such large-scale facilities as the railway bridge across the Moskva River on 114 km of the Moscow-Ryazan line according to the scheme 18+2×110+18 m, the railway bridge across the Oka River on 107 km of the Moscow-Ozherelie line according to the scheme 18+4×127+18 m, the following fa-cilities have been constructed and commissioned: the railway bridge across the Oka River on 105 km of the Moscow-Kursk line according to the scheme 45+110+45 m, the railway bridge across the Klyazma River on 25 km of the Moscow-Alexandrov line according to the scheme 1×44 m, the railway bridge across the Oka River on 285 km of the Sukhinichi-Gorbachyovo line according to the scheme 22.3+2×98+22.3 m. A set of overhaul works have been executed in relation to the man-made structures which has allowed starting the high-speed train operation along the section Moscow-Airport-Domodedovo, large-scale overhaul and anticorrosion protection works have been performed in relation to the surfaces of the supports and superstructures of the bridges, overhead crossings, revetment walls and other engineering structures of the Moscow railway system, overhaul and reconstruction of the man-made structures of the railway line Tuapse-Adler of the North-Caucasian railway have been carried out. 
1999 Construction Company Stroymost-1 is a limited liability company established based on the liquidated mostootryads of Moststroy-10 trust which has completed its participation in the Baikal-Amur Mainline construction.

Construction Company Stroymost-1 cooperates with the leading design institutes, including Giprotransput, Sibgiprotransput (affiliates of OJSC Roszheldorproekt), OJSC Giprotransmost Institute, CJSC Giprotransmost Saint Petersburg In-stitute, OJSC Giprotransmost, Federal State Budgetary Institution TsNIIS, OJSC IERT, CJSC Peter-burg-Dorservice, with large construction companies, such as OJSC USK MOST, OJSC STORY-TREST, LLC CC Mostotrest, LLC USK MOST, LLC Spetsmost, LLC SMP, Federal State Unitary Enterprise GU SDA under Spetsstroy Rossii, OJSC Mezhregiontruboprovodstroy, CJSC MTKO, and with the Customer’s bodies, in particular with the departments of JSC Russian Railways and Services and Divisions of the Moscow Railway. The engineering and technical and working capacity of the per-sonnel of CC Stroymost-1 is based on the work experience in the construction of railways, man-made and hydraulic engineering structures, including under the conditions of the Far North and Far East, exceeding 30 years.
Besides, the employees of CC Stroymost-1 have participated in the construction of the Baikal-Amur Mainline bridges over the rivers of Aldan, Ikabiekan, Nyukzha, Olekma, elevated structures in the Chyortovo Gorge bypassing the Severo-Muisky tunnel, bridges on the Amuro-Yakutskaya highway over B. Nemnyr, Yakokit, bridges on the Ust-Kuiga highway – Deputatsky (Zapolyariye), mooring berth in the settlement of Deputatsky and other facilities.


Since the beginning of 2010 LLC CC Stroymost-1 has been a member of two self-regulating organizations working in the field of design and construction.

Certificate No. 0400.4-2013-7701341435-П-011 of competency for the works affecting the safety of the capital construction projects has been issued based on the Resolution of the Presidium of Nonprofit Partnership SOVET PROEKTIROVSHCHIKOV (regis-tered in the State Register of Self-Regulating Organizations under СРО-П-011-16072009) (Minutes No. 41 dated February 14, 2011).

tificate No. 0635.2-2012-7701341435-С-018 of competency for the works affecting the safety of the capital construction projects has been issued based on the Resolution of the Presidium of Nonprofit Partnership ALIANCE STROITELEI (registered in the State Register of Self-Regulating Organizations under СРО-С-018-16072009).

In March 2011 the Company successfully underwent the field check performed by Nonprofit Partnership Self-Regulating Organization SOVET PROEKTIROVSHCHIKOV, in March-April 2012 it underwent the check performed by both self-regulating organizations. Besides, being the member of the self-regulating organizations, the Company passed the assessment of work places.

In April 2012 all the employees of the Company permitted to execute the works affecting the safety of the capital construction projects successfully passed the qualification assessment procedure in the Self-Regulating Organizations, Nonprofit Partnership SOVET PROEKTIROVSHCHIKOV and Nonprofit Partnership ALIANCE STROITELEI.

Being the member of the self-regulating organizations, LLC CC Stroymost-1 applies the Quali-ty Management System the efficiency of which is confirmed by the annual technical inspections (Cer-tificate of Conformity No. СДС.ЕР.СМ. 01242-13).